首采面回采期间覆岩运移规律的研究对提高矿山安全性和作业效率具有重要价值。以长平煤矿六盘区6301首采面为研究背景,通过理论分析、数值模拟和现场实测对首采面回采期间覆岩运移规律进行研究。研究表明,6301工作面回采至40 m时,老顶发生初次破断,超前支承压力影响范围为超前工作面85 m以内。首采面垮落带高度为20~30 m,裂隙带高度为30~40 m,弯曲下沉带延伸至距工作面顶板50 m及地表。现场观测表明,“见方”期间压力普遍高于正常回采期间。直接顶初次垮落步距在11.8~15.1 m之间,基本顶初次来压步距在28.6~35.2 m之间,基本顶周期性来压步距为12.81~25.1 m。
Abstract:The study of overburden migration law during mining of the first mining face is of great value to improve mine safety and operation efficiency.Based on the research background of 6301 first mining face in Six Panel Area of Changping Coal Mine, the migration law of overburden rock during mining of the first mining face is studied through theoretical analysis, numerical simulation and field measurement.The research shows that when the 6301 working face reaches 40 m, the old roof breaks for the first time, and the influential range of the advanced abutment pressure is within 85 m of the advanced working face.The height of the collapse zone of the first mining face is 20~30 m, the height of the fracture zone is 30~40 m, and the curved subsidence zone extends to 50 m away from the roof of the working face and the surface.Field observation shows that the pressure during the “square” period is generally higher than that during the normal mining period.The initial collapse step distance of direct roof is between 11.8 and 15.1 m, the initial weighting step distance of basic roof is between 28.6 and 35.2 m, and the periodic weighting step distance of basic roof is 12.81 and 25.1 m.
[1] 陈方明,朱友恒,朱凯.邵寨煤矿Ⅰ盘区首采工作面矿压显现规律研究[J].山东煤炭科技,2023,41(4):67-69,72.
[2] 张建.红树梁煤矿首采面智能岩移观测站设计研究[J].煤炭工程,2021,53(8):12-15.
[3] 何祥锐,邱贤阳,史秀志,等.基于非线性弹性地基梁的地下矿山充填开采覆岩移动规律研究[J].黄金科学技术,2024,32(4):640-653.
[4] 张广学,房振,韩杰,等.营盘壕煤矿首采面地表移动特征实测研究[J].金属矿山,2019,48(10):81-86.
[5] 毛振国,朱术云,邓昊,等.下组煤首采面综放开采受上组煤老空水威胁程度研究[J].工程地质学报,2023,31(6):2051-2059.
[6] 张寒寒,任建慧.高强度回采的首采面一次见方期矿压规律研究[J].能源与环保,2024,46(4):260-266.
[7] 蔡俊杰,李希建,郭隆鑫,等.近距离下煤层首采面开采对软弱煤岩破坏变形特征的影响[J].煤炭工程,2023,55(6):123-127.
[8] 于水,黄克军,杨建辉.曹家滩煤矿首采面导水裂隙带高度研究[J].陕西煤炭,2020,39(S1):42-46.
[9] 史莉红,毛振国,朱术云.综放开采下组煤首采面上覆老空水探查及突水危险性评价[J].煤矿安全,2024,55(3):209-215.
基本信息:
DOI:10.20120/j.cnki.issn.1671-749x.2025.0701
中图分类号:TD325
引用信息:
[1]豆曙杰,李健.长平煤矿首采面回采期间覆岩运移规律研究[J].陕西煤炭,2025,44(07):1-6.DOI:10.20120/j.cnki.issn.1671-749x.2025.0701.
基金信息: